Customer Background
A national grid company operates over 50,000 km of high-voltage lines, mostly through mountains, hills, and rivers. Manual inspection is inefficient, labor-intensive, and hazardous.
Key Challenges
Strong electromagnetic fields around lines demand high anti-EMI performance.
Long continuous operation requires high endurance.
Complex terrain needs stable low-altitude flight and precision control.
Flexible configuration for different voltage levels.
Solution
Luminex delivered a High-Voltage Transmission Line Inspection Specialized Drone Power System Solution:
Strong anti-EMI power design for stable operation in 500kV environments.
Ultra-long-endurance battery for 120 minutes per flight.
Precision control for stable hovering within 1 meter of lines.
Modular components for flexible configuration.
Quantified Outcomes
Inspection efficiency improved 5×, up to 80 km per drone daily.
Defect detection rate rose from 70% to 98%, reducing grid risks.
Inspector labor intensity reduced by 80%, eliminating high-altitude hazards.
Overall inspection cost reduced by 70%.
Customer Testimonial
“Luminex power system revolutionized our line inspection. Excellent anti-interference and long endurance enable efficient, safe inspections, ensuring stable grid operation.”